TRACK RECORD

Offshore Wind Farms

More than 1400 CPS complete systems supplied to 15 Offshore Wind Farms

PROJECTS EQUIPMENT TYPE CABLE INSTALLATION OPERATOR COUNTRY YEAR
RIFFGAT CPS for monopile entry hole with sealed interface
CPS for J-tube
Nexans Nexans EWE Germany 2012
GUNFLEET SANDS III CPS for monopile entry hole
CPS for J-tube
JDR Technip OW Dong Energy UK 2012
BORKUM RIFFGRUND I CPS for monopile entry hole
CPS for J-tube
Nexans CT Offshore Dong Energy Germany 2013
KENTISH FLATS EXTENSION CPS pre-installed onshore on Transition Piece NSW GeoSea - Deme Vattenfall UK 2014
INNOGY NORDSEE I CPS for monopile entry hole
CPS for J-tube
JDR Siem Offshore RWE Germany 2014
GODE WIND I CPS for monopile entry hole
CPS for J-tube
Nexans CT Offshore Dong Energy Germany 2015
GODE WIND II CPS for monopile entry hole
CPS for J-tube
Nexans CT Offshore Dong Energy Germany 2015
VEJA MATE CPS for monopile entry hole
CPS for J-tube
JDR Siem Offshore Veja Mate Germany 2015
SOUTH ISLAND I CPS for monopile support cage Long Yuan Z.N. - Longyuan China 2015
PINGHAI BAY I CPS pre-installed onshore on jacket - - Ming Yang China 2015
AMRUMBANK CPS for monopile entry hole with sealed interface
CPS for J-tube
NKT Siem Offshore E.On Germany 2015
HORNS REV III CPS for jacket - Export cables ABB JD-Contractor Energinet Denmark 2016
TRIANEL BORKUM II CPS for monopile entry hole
CPS for J-tube
NSW Siem Offshore EWE
Trianel
Germany 2017
HORNSEA I CPS for monopile entry hole
CPS for J-tube
JDR
Nexans
Siem Offshore
DeepOcean
Dong Energy UK 2017
HORNS REV III CPS for monopiles - IAC cables
CPS for J-tubes - IAC cables
Prysmian VBMS Energinet Denmark 2017
TRIANEL BORKUM II CPS for jacket - Export cables Hellenic Cables Jan De Nul TenneT Netherlands 2017
BORKUM RIFFGRUND II CPS for jacket - Export cables Hellenic Cables Jan De Nul
Dong Energy Germany 2017
NORTHER CPS for monopile entry hole
CPS for J-tube - IAC and Export cables
- Van Oord Norther Belgium 2017
PINGHAI BAY II CPS for monopile support cage
CPS for multi-pile concrete head
HengTong 3rd Harbour Eng. Fujian Energy China 2018
SOUTH ISLAND II CPS for monopile support cage Long Yuan Z.N. - Longyuan China 2018

Recommendation extracts

Veja Mate - Inter array cable installed 10 weeks ahead of schedule

K2 Management Array Cabling and Grid Connection Senior Project Manager: "It was definitely the right decision to go with Seaproof. Our client representatives reported that the system was easy to install and that it took less time than expected."


 
 

Please Contact Us For Detailed Information